Beijing-Guangzhou-Shenzhen-Hong Kong High-Speed Railway

Beijing–Guangzhou-Shenzhen-Hong Kong High-Speed Line
京广深港高速铁路
Overview
Type CRH
Locale China
Termini Fengtai Railway Station
Guangzhou South Railway Station
Stations 49
Operation
Opened 2009~2015
Owner China Railway,MTR
Operator(s) China Railway High-speed,MTR
Depot(s) Beijing, Shijiazhuang, Zhengzhou, Wuhan, Changsha, Guangzhou, Shenzhen, Hong Kong
Rolling stock CRH
Technical
Line length 2240 km
Track gauge 1,435 mm
Operating speed 350 km/h (Maxium)

The Beijing–Guangzhou Passenger Dedicated Line (simplified Chinese: 京广深港高速铁路; traditional Chinese: 京廣深港高速鐵路) is a high-speed railway of the CRH passenger service, connecting Beijing West Railway Station and West Kowloon Station. It is 2080 km long. The Jingguang railway runs largely parallel to the line.

Main route

Line Description Designed
Speed
(km/h)

Length
(km)

Construction
Start Date

Open Date
top
trip speed
Beijing-Shijiazhuang PDL
(Jingshi Passenger Designated Line)
HSR from Beijing to Shijiazhuang 350 281 2008-10-08 2012-10-01 -
Shijiazhuang-Wuhan PDL
(Shiwu Passenger Designated Line)
HSR from Shijiazhuang to Wuhan via Zhengzhou 350 838 2008-10-15 2012-10-01 -
Wuhan-Guangzhou PDL
(Wuguang Passenger Designated Line)
HSR from Wuhan to Guangzhou via Changsha 350 968 2005-09-01 2009-12-26 313[1]
Guangzhou-Shenzhen-Hong Kong XRL
(Guangshengang Express Rail Link)
HSR from Guangzhou to Hong Kong via Shenzhen 350
(Guangzhou South-Shenzhen North Section)
200
(Shenzhen North-West Kowloon Section)
142 2005-12-18
(Mainland Section)
2010-01-27
(Hong Kong Section)
2011-12-26
(Guangzhou South-Shenzhen North Section)
2012-09
(Shenzhen North-Futian Section)
2015
(Futian-West Kowloon Section)
-

References

  1. ^ (Achieved by G1001,G1003) G1003列车时刻表 (Chinese) Wuhan-Guangzhou North/2hr57min)